Mangapwani Port Ring Road – Phase 2

Customer

The Revolutionary Government of Zanzibar – Ministry of Infrastructure, Communication and Transport

Area

Zanzibar, Tanzanya

City

Mangapwani

Budget

$ 93.092.500,00

Project Status

Under Construction

Size

Within the scope of the project, the total length of roads to be constructed as single carriageway is 91.4 km, the length of roads to be constructed as dual carriageway is 7.2 km, and the length of concrete-paved roads is 15.2 km, resulting in a total road length of 113.8 km.

Sub-Sector

Road and Transportation Projects

About Project

The Mangapwani Port Access Roads Phase II Project has been designed to strengthen the transportation infrastructure of Zanzibar Island. Within the scope of the project, roads with a total length of 113.8 kilometers are being constructed. Of this total, 91.4 km are planned as single carriageway, 7.2 km as dual carriageway, and 15.2 km as concrete-paved roads. In addition, the project includes the construction of a 110-meter-long bridge.

All design and construction works of the project are undertaken by Orkun Infrastructure. The scope of work includes infrastructure construction, drainage systems, asphalt pavements, sidewalk construction, installation of lighting poles, landscaping, as well as the implementation of intersections and road signage and markings.

This comprehensive road project aims to enhance the efficiency of the logistics network connected to Zanzibar Port and its surroundings, while providing safe and fast transportation for both urban and port connections. All works are carried out in accordance with international quality standards.